Spellcheck dictionary
  • Spellcheck dictionary
  • Misspelling dictionary

How to Pronounce critical-path method?

Correct pronunciation for the word "critical-path method" is [kɹˈɪtɪkə͡lpˈaθ mˈɛθəd], [kɹˈɪtɪkə‍lpˈaθ mˈɛθəd], [k_ɹ_ˈɪ_t_ɪ_k_əl_p_ˈa_θ m_ˈɛ_θ_ə_d].

What are the misspellings for critical-path method?

  • xritical-path method,
  • vritical-path method,
  • fritical-path method,
  • dritical-path method,
  • ceitical-path method,
  • cditical-path method,
  • cfitical-path method,
  • ctitical-path method,
  • c5itical-path method,
  • c4itical-path method,
  • crutical-path method,
  • crjtical-path method,
  • crktical-path method,
  • crotical-path method,
  • cr9tical-path method,
  • cr8tical-path method,
  • crirical-path method,
  • crifical-path method,
  • crigical-path method,
  • criyical-path method

What is the adjective for critical-path method?

The adjective form of "critical-path method" is "critical-path".

Usage over time for critical-path method:

This graph shows how "critical-path method" have occurred between 1800 and 2008 in a corpus of English books.

What is the plural form of critical-path method?

The plural form of the word "critical-path method" is "critical-path methods".

What is the singular form of critical-path method?

The singular form of the word "critical-path method" is "critical-path method". It remains unchanged in the singular form.

Synonyms for Critical-path method:

Word of the day

Nip and tuck

  • bip and tuck
  • hip and tuck
  • jip and tuck
more